Last updated November 2026

There isn’t one maximum size for home solar in Australia. How big you can go depends on three things: your local electricity network, whether your home has single-phase or three-phase power, and how much power you want to send back to the grid.

Why are there limits?

Electricity networks were built to send power one way, from power stations to homes. With millions of homes now exporting solar power, networks limit how much each home can send back to keep voltage stable and the grid running safely.

The three things that set your limit

1. Your inverter size
Networks usually limit the size of your inverter (measured in kVA or kW) rather than your panels. Under current rules, your panels can usually be up to a third larger than your inverter and still be eligible for the federal solar incentive (STCs). For example, you could have around 6.6 kW of panels on a 5 kW inverter.

2. Single-phase or three-phase power
Most older homes have single-phase power, which has lower limits. Three-phase power allows a bigger system. If you’re planning a large solar system plus a battery or EV charger, ask your installer whether upgrading to three-phase is worth it.

3. Your export limit
This is how much power you can send back to the grid at any one time. Many networks set a fixed export limit per phase. Some limit exports more in busy areas, or don’t allow exports at all. A larger system with an export limit can still make sense, because you use more of your own solar and can store the rest in a battery.

Flexible (dynamic) exports

More networks now offer flexible or “dynamic” exports. Your export limit changes during the day depending on how busy the network is. When there’s spare capacity, you can export more than a fixed limit allows. When the network is busy, your exports are reduced.

Flexible exports usually need a compatible inverter connected to the internet. Some networks now require them for new systems, and others are rolling them out over the next few years.

State snapshot (as of November 2026)

  • WA (main grid): since 1 May 2026, new and upgraded systems up to 30 kVA must be able to be switched off remotely in a grid emergency. If you opt out of export products, you can still export up to 1.5 kW.
  • QLD (Energex area): single-phase homes can install up to 10 kVA of solar and battery inverters on a fixed connection, or more with a dynamic connection, which allows exports of up to 10 kW per phase when the network has spare capacity.
  • SA: SA Power Networks offers flexible exports, which can allow much more export than its fixed option.
  • Other states: limits vary by network and area. Check with your network or installer.

How to find your limit

1. Find your network. Your electricity network (distributor) is not the same as your retailer. Use the AER’s Who is my distributor? page.

2. Check its solar connection rules. Each network publishes its own:

StateNetwork
NSWAusgrid, Endeavour Energy, Essential Energy
ACTEvoenergy
QLDEnergex, Ergon Energy
SASA Power Networks
VICCitiPower, Powercor, United Energy, Jemena, AusNet
TASTasNetworks
WAWestern Power, Horizon Power
NTPower and Water

3. Ask your installer. A good installer will check your network’s rules, apply for approval and design the system to fit. If a quote is bigger than your network allows on a standard connection, ask how it will be approved and whether exports will be limited.

FAQs

Can I install more panels than my export limit?
Usually, yes. Your export limit controls how much you send to the grid, not how much you can generate and use at home. Your inverter can limit exports automatically.

Will a bigger system still get a feed-in tariff?
Yes, for the power you’re allowed to export. Feed-in tariffs come from your electricity retailer, so check your plan.

Does adding a battery change my limit?
It can. Some networks count battery inverters towards your total inverter size. Your installer can check.

Get 3 quotes